From:                              route@monster.com

Sent:                               Friday, April 08, 2016 12:07 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 PMP

 

This resume has been forwarded to you at the request of Monster User xapeix03

Confidential Resume

Last updated:  02/09/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

Confidential Resume

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: CV - Neil Anderson

Resume Value: czv7zhrb6q8qhgfv   

  

 

Neil C. Anderson

5077 NW 7Th Street, Apt 1516

813.466.4146

Miami, FL 33126

neil.anderson@criticalmanagementgroup.com

Summary

10+ years project controls experience. Managed project information within and between scheduling and cost databases, project management programs, accounting software, and legal systems. Developed logic, analyzed critical path, updated progress and generated reports and graphics in support of clients’ schedule, resource, cost, and risk management objectives.

 

Experience              

Bouygues Civil Works

Senior Scheduler, September 2013 – Present

·         Created and maintained the P6 schedule for one of the largest commercial construction project in Southeast United States, consisting of a hotel, two condominium towers, two office buildings and retail shopping.

·         Coordinated the scheduling efforts of the owner, general contractor and multiple subcontractors.

·         Generated progress and variance reports in P6, Excel, and Adobe Acrobat Pro for graphical area callouts.

Invensys Operations Management

Lead Scheduler, Lead Cost Engineer, June 2012 – August 2013

·         Created and maintained an integrated schedule of hardware and software engineering, procurement and equipment qualification for the reactor protection systems of eight nuclear units in China.

·         Trained and managed six junior schedulers and cost engineers.

·         Loaded and leveled resources in accordance with staffing and budget requirements.

·         Generated schedule and cost reports using P6, Excel, Visio and PowerPoint.

·         Led meetings and coordinated the efforts of staff, subcontractors and vendors on four continents.

Bechtel Power Corporation

Construction Scheduler / Lead Engineering Scheduler, December 2008 – June 2012

·         Integrated the Engineering, Procurement, and Construction schedules including overall planning and schedule development, analysis, and reporting.

·         Was accountable for understanding the overall master project scope and schedule objectives; for developing and maintaining plans and schedules to accomplish same.

·         Produced detailed execution schedules, resource utilization plans, and progress tracking systems, as well as coordinated schedule interfaces with owners, vendors and subcontractors.

·         Supported schedule, manpower, quantities, progress, and performance reporting.

·         Was responsible for monitoring and managing critical path to identify issues and recommend mitigation.

CS3 Consulting Services, Inc.

Project Coordinator, 1998 – 2008 (Part-time while earning BA and JD degrees)

·         CZV – Project Longhorn, Project Zeiss Technology Center, Project Shine

Supported project kickoff and implementation of three-company joint venture (Longhorn), the construction of a new manufacturing facility with plant, equipment, and IT components (ZTC), as well as the deployment of a new design process (Shine). Designed and developed resource-loaded schedules in Microsoft Project; attended weekly teleconference status meetings; maintained, analyzed, and reported monthly schedule progress using Microsoft Project (2007-2008).

·         Central Florida Landscaping - Developed resource leveled maintenance and construction schedules for large landscaping contractor in Primavera P5 for 160+ projects (2006).

·         MJ Anderson – Project Bascombe Palmer Eye Center

Supported project team in analysis of delay claims cross-referencing logs, correspondence, and as-planned versus as-built schedules; identified/analyzed/resolved schedule anomalies and conflicts using MSP (2002).

·         CH2M Hill – Project WWTF South Florida Water Management District

Supported project controls for the design development and construction of waste-water treatment plant, pumping station, and pipeline. Collected and input monthly schedule updates from six general contractors, four utilities, and multiple subs; generated monthly report packages using Primavera P3 (1998-2001).

Education

·         Project Management Professional (PMP), 2013 – Project Management Institute (PMI)

·         Juris Doctor, 2007 – Florida International University College of Law, Miami, Florida

Honors: Book Award – Legal Skills II

·         Bachelor of Arts, 2004 – University of South Florida, Tampa, Florida

Tools

·         Scheduling Systems – Primavera P3, P5, P6; Microsoft Project (MSP)

·         Microsoft Systems – Excel, Word, PowerPoint, Visio, Outlook, Access



Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-FL-Miami

Relocate:

No